FerwoodFerwood
    nolink
    nolink

    Ferwood Approved

    Ferwood Approved - The Maximum Standard

    Ferwood Approved - The Maximum Standard

    Ferwood Approved  is the Group’s quality certificate. Machines have been overhauled and reconditioned to the highest standards and carry a warranty for futher peace of mind. These machines have been brought back to the operational condition they were when new. This 10-step process follows the machines through the entire chain, from design to installation, checks, updates and testing.

    The 10 steps that make a machine “Ferwood Approved”.

    • 1Cleaning
    • 2Painting
    • 3Replacement
    • 4Checks
    • 5Inspection
    • 6Customization
    • 7Preparation
    • 8Testing
    • 9Delivery
    • 10Installation
    1
    Cleaning

    Component disassembly and  thorough machine cleaning

    Component disassembly and  thorough machine cleaning

    Ferwood Approved services

    • Consultancy
    • Ferwood Approved
    • Customization
    • Installation and Testing
    • On-Site Training
    • Certified Warranty
    • After-Sales Support
    • Transport

    Purchase advice aimed at the customer’s production needs, from a product and project standpoint